Kessock Road Bridge Reduction In Air Draught

Posted on

Notice to Mariners No. 02/2016

SCOTLAND EAST COAST

APPROACHES TO INVERNESS HARBOUR/INVERNESS MARINA/CALEDONIAN CANAL

KESSOCK ROAD BRIDGE REDUCTION IN AIR DRAUGHT

Mariners are advised that the Advertised Clearance on the Admiralty Chart under the Kessock Bridge at Mean High Water Springs of 29.000 metres will be reduced to 25.790 metres for the duration of the Replacement Tuned Mass Damper Scheme.

Secondly, a vessel named The Rosehaugh, will be on station for the duration of the works and be located immediately under the Day Marks.

Kessock Bridge, Centre Span, 57 degrees 29.98' N 04 degrees 13.82' W

These Works will commence on 16th May 2016 and be completed by 29th July 2016.

Therefore, Mariners are advised to navigate with Caution in this area until repairs have been effected.

Any vessel with a height above sea level greater than 23 metres must contact the BEAR Scotland Major Bridges Manager on (44) 0787 682 5859 in sufficient time to warn BEAR Scotland personnel working under the bridge of the imminent arrival of said vessel.

Bear Scotland

10th May 2016

Office Contact Information

  • T: +44 (0) 1463 220501
  • E:
  • Registered Office: Longman Dr, Inverness IV1 1SU Scotland
  • Registered in Scotland No. SC325102

Our Website